Full Cylindrical Hot Water Boiler
Full Cylindrical Hot Water Boiler

BHT-TS Model

Thanks to the interconnected cylindrical lower and upper bodies, less width and easy entry and installation of the boiler into the boiler room are provided.

It is designed as three-pass positioned one above the other for optimum thermal balancing and heat energy use, as well as lower operating costs.

Boiler life is extended thanks to the uninterrupted transition in all three passes and the balanced cooling of the flue gases.

During the three-passes, the heat from flame formed in the combustion chamber is carried to the water at a high rate by radiation heat transfer.

Since the smoke pipes are welded to the plates, it is suitable for safe operation and pipe replacement task is made effortless, extending the boiler’s life.

Thanks to low flue gas emissions, the damage to the environment is minimized.

The third pass provides maximum benefit from heat energy thanks to the turbulators placed in the smoke pipes.

With the use of optimum insulation material with high density, heat losses are reduced to a minimum and boiler efficiency is further increased.

It provides fuel saving with its low fuel consumption.

It can be easily placed in tight spaces, offering on-site manufacturing flexibility.

The boilers are CE certified according to the new hot water boilers 92/42/EC and gas-burning appliances 90/396/EC regulations.